$19.5K30,000 sq. ft. commercial office • Toronto, Ontario
Prepared by SimEffi • Illustrative data onlyThe building shows a stronger near-term case for controls, commissioning and operational optimization than for envelope replacement or major electrification. Aging rooftop HVAC should be coordinated with the planned capital cycle rather than justified on energy savings alone.
Operational optimization + commissioning.
$19.5KQuick wins + BAS/controls + targeted lighting.
$82.5KOptimization + major HVAC replacement + envelope evaluation.
$400K+HVAC scheduling, controls tuning and commissioning.
BAS / smart controls, networked lighting and validated VFD opportunities.
Evaluate replacement options, electrification and incentive pathways as part of the planned capital cycle.