Sample assessment

See exactly what you get.

The complete SimEffi assessment for Pilot Building — a 30,000 sq ft commercial office in Toronto. Real structure, real methodology, illustrative data.

Sample report cover showing a SimEffi Score of 43 out of 100 Sample report page showing the twelve-month energy baseline Sample report page showing the three-year capital roadmap
Inside the report

Nine pages. No hidden method.

Written for the person who has to defend the spend to an owner or a board. Every figure traces back to a bill or a stated assumption.

  • SimEffi Score™ and executive summary
  • 12-month energy baseline and benchmarking
  • 12 ranked efficiency opportunities
  • Retrofit scenarios and financial analysis
  • SimEffi Incentive Action Plan™ with official program links
  • Potential incentive status, eligibility notes and application timing
  • Three-year capital roadmap and cash position
  • Sensitivity analysis and methodology
  • Assumptions and limitations, stated plainly
Findings

What the sample assessment concluded

43
SimEffi Score™

Priority band

Below 50 places the asset in the priority band — the widest gap in a portfolio and the first candidate for capital.

$29,898
Adjusted annual savings

About 33% of utility spend

From a five-measure package costing $285,000 gross, $169,500 net of estimated incentives, at a 5.7-year payback.

2032
Breakeven

Cumulative net cash

The three-year roadmap dips to −$105,000 in 2028 when the rooftop units are replaced, then crosses zero in 2032.

Free sample report

Download the SimEffi sample assessment.

See how we turn building and utility data into actionable intelligence. No sales call required — the report speaks for itself.

What we do with your details. Your information is used to fulfil this request and to understand interest in SimEffi services. We do not sell it. See our privacy notice.

By submitting you agree to be contacted about your request. The sample report is illustrative and does not constitute engineering advice.

Want this for your building?

The sample takes ten minutes to read. Your own assessment takes about two weeks.